The City routinely evaluates road condition and maintains a priority based resurfacing program based on a Pavement Condition Index (PCI) score. The City employs an independent third party to survey and rate all City-owned roads using the ASTM 6433 Standard Practice for roads and Parking Lots Pavement Condition Index Surveys. The latest PCI report is available at this link.
Streets remain open during resurfacing work; however, please makes sure vehicles are not parked in the roadway. If you have a sprinkler system, please ensure that the system is not spraying water into the road. Expect minor delays accessing your street while crews are working.
The work is done in phases:
- Phase 1: Notice - Our goal is to provide at least one week's notice. The schedule takes into account weather and time to complete the roads in progress.
- Phase 2: Milling - Crews mill (grind up) the old asphalt. Following the mill process, it can take up to 7 days before paving takes place.
- Phase 3: Paving
- Phase 4: Clean Up - Public Works crews inspect the quality of the paving work and the clean up the area as needed. If additional work is required, it is scheduled and typically completed within three business days.
Paving Schedule
Paving Schedule: June 24, 2024
Street Name | From Street | To Street | Work Beginning | |
ROYERVISTA DR | EOP | ROYER PL | Ongoing | |
ROYERVISTA DR | ROYER PL | ROYER CT | Ongoing | |
BRANSFORD RD | HIGH POINT RD | SHIVER SMT | Ongoing | |
TAMARISK DR | HIGH POINT RD | CUL-DE-SAC | Ongoing | |
ELDEN DR | GREEN HILL PL | GREEN HILL PL | Ongoing | |
TIMBER TRL S | CUL-DE-SAC | TIMBERLAND DR | June 21, 2024 | |
TIMBER TRL S | TIMBERLAND DR | TIMBER VALLEY RD | June 21, 2024 | |
HIGH BROOK DR | CUL-DE-SAC | HIGH POINT RD | June 24, 2024 | |
WINDSOR PKWY | HEDDEN ST | BRINKLEY LN | June 26, 2024 | |
WINDSOR PKWY | NORTHLAND DR | WINDSOR GATE CT | June 26, 2024 | |
WINDSOR PKWY | WINDSOR PKWY | WINDSOR PKWY | June 26, 2024 | |
WINDSOR PKWY | WINDSOR PKWY | WINDSOR CT | June 26, 2024 | |
HIGHGROVE POINTE | WINDSOR PKWY | CUL-DE-SAC | June 28, 2024 | |
VALLEYFIELD DR | DUNCOURTNEY DR | CUL-DE-SAC | June 25, 2024 | |
FIRE STATION | SPAULDING DR | MT VERNON RD | June 25, 2024 | |
CURRY DR | WOODCHASE CT | PEACHTREE DUNWOODY RD | July 1, 2024 | |
CURRY DR | WOODCHASE CT | CUL-DE-SAC | July 1, 2024 | |
WOODMOORE CT | S TRIMBLE RD | CUL-DE-SAC | July 3, 2024 | |
RIVEREDGE PKWY | RIVEREDGE PKWY | EOP | July 8, 2024 | |
PERIMETER CTR W | MARTRA TRAFFIC SIGNAL | TRAFFIC SIGNAL AT 1165 PERIMETER CTR W |
July 11, 2024 | |